Small Rail Construction Office 1890
Narrow trackwork workshop 1890 & 1891 for the construction and demolition of tracks
sRCO1890: maximum of 2 trackwork trains and 2 rail connections; 3 truck unloading stations
sRCO1891: maximum of 1 trackwork train and 1 rail connection; 2 truck unloading stations
Both workshops have:
– expanded connection options, including for the conveyor belts with an additional exit
– narrower dimensions; resource distribution to other buildings via conveyor belts (if desired)
– resource purchasing and storage as in the vanilla RCO
+ demolition functions and containers for rubble
+ coal/water storage for steam locomotives
Background: Large workshops are not needed everywhere. Often, a trackwork train, used specifically on site, is sufficient. The workshops are less expensive due to their smaller equipment, making them ideal for targeted distribution throughout the country.
Tip:
Recommended amount of construction rubble for RCO 1891 is approximately 20 tons and for RCO 1890 approximately 30 tons for one track section!
A track section for demolition should not be too long to avoid overfilling containers. Otherwise, you will be forced to connect an additional container space via a factory connection.
Track sections for demolition can be divided using signals or waypoints.
This mod uses in-game textures from 3DIVISION / WR 🙂
PS: This text will be slightly modified for machine translation into other languages.
Revisions:
Old revisions of this mod are available below. Click the link to download.