Improved Military Engineer

If you liked this item, please rate it up on Steam Workshop page.

Authors: americanslon™, Mügwümp

Last revision: 10 May, 2019 at 15:26 UTC (1)

File size: 18.43 KB

On Steam Workshop

Description:

Various Improvements to the Military Egineer

– has 10 charges, maintenance of 6 and cost of 850
– can hurry production of Flood Barriers by a third. Only if full charges. Consumes the unit
– can fully hurry production of Dam, Canal and Aqueduct districts. Only if full charges. Consumes the unit
– removes similar functionality that comes from GS expansion to avoid confusion and conflict and to restore some balance (that functionality becomes OP since the number of charges has been changed)

Localized in:
English
Russian
French
-shoot me a line if you want to help with localization

DISCLAIMER:
This mod removes the UNITCOMMAND_DISTRICT_PRODUCTION action. Any mods trying to piggyback off of that action will likely have a problem.

Download
Revisions:

Old revisions of this mod are available below. Click the link to download.