|-| M/F Solidarity – 56 Meter Medium Interisland Ferry |-|

If you liked this item, please rate it up on Steam Workshop page.

Author: MyStar

Last revision: 18 Mar at 17:03 UTC

File size: 10.3 MB

On Steam Workshop

Description:
M/F Solidarity – MyStar Build Off Season 1

——————————————————————————————————

DO NOT TURN ON INFINITE ELECTRIC IT WILL MAKE THE SHIP CONSTANTLY TURN!!

——————————————————————————————————

History
Building Process

It’s the late 90s (SW Time) and the newly registered company Sawyerlinea desperately needs a new vessel to accomodate the route between Olsen Bay and The Fishing Village. New competition shows up when companies like Neatica and OV-Line are on the rise. The CEO and the people in high positions in Sawyerlinea are starting to get worried, but luckily after a winter and a stock market crash, Solidarity finally began construction. Solidarity’s keel was finally laid almost 3 years after her initial promised construction start date. The building process caused delays and controversys around Sawyer, but finally after 1,5 years of construction she was finally launched and was finished. Sea trials began a few months after.

Early Life

Solidarity finally began It’s maiden voyage in spring 2000 (SW Time). Solidarity looked nowhere like she did today. Before the structual remake of Solidarity, she had one funnel. an open car deck and not enough space for alot of passengers, which made her quite successful but the company thought she’d do better. However the competition was so strong that the number of revenue for Solidarity was stagnent.

Reshaping the superstructure and Success

In the late 2000s, Solidarity was growing old and badly needed a remake and a new self. She was brought to the FJ Warner Docks Shipyard where most of her superstructure was reshape or dismantled alltogether. She came out of the docks with a brand new blue, yellow, white, yellow, blue, livery and a sleek superstructure ready for her new years as a new self. After being re-delivered by the shipyard, she was placed on the Terminal Spycakes – Camodo – Olsen Bay route. She finally managed to be successful after 10 years. Her passenger fell in love with the new lady and got awarded the nickname "New Reliable" from the locals in the area. She finally became a household name for not just Sawyerlinea but the entire MyLink Corperation.

Solidarity Today

Today, the profits have died down slightly but shes still getting the love as she got when she was achieving success. She has been overshadowed by other larger Sawyerlinea ships. It is expected that she will be long-therm chartered or sold in the near future.

——————————————————————————————————

Accidents and Incidents

2000, Dec 14th. (SW Time) – Ran aground outside Fishing Village Beach
2001 Oct 13th (SW Time) – Engine fire, which caused a blackout and the ship left drifting before raming the dock in Olsen Bay
2008 June 24th – Collision with local fuel tanker
2020 April 19th – Near collision with N/V Concordian

——————————————————————————————————

Specifications

LOA -56 meters
Width – 8.75 meters
Weigtht – 140,000 SW Mass
Car Capacity – 0 (Before remake 10)
Passenger Capacity – 115
Top Speed – 26 Knots
Order Cost – 42,200,000 Sawyer Dollars

——————————————————————————————————

Features

  • Detailed & decorated interior spaces
  • Medium range
  • Bow, stern and midships thrusters
  • Detailed exterior
  • Modern systems
  • and a whole lot more

——————————————————————————————————

Credits