Tyne and Wear Metro Remastered

If you liked this item, please rate it up on Steam Workshop page.

Author: TSG

Last revision: 14 Dec, 2023 at 17:46 UTC

File size: 873.89 KB

On Steam Workshop

Description:

UPDATE (14/12/2023)

– Partially built the Leamside Line next to Pelaw
– Relocated Felling slightly North
– Added a Road Bridge over the Western End of Gateshead Stadium
– Fixed the Missing Tunnel between Haymarket and Jesmond
– Redone the Heworth Crossover to match it’s real design

*Note: if you are running a Green Line Southbound Service, you may be held at a red signal near South Gosforth for a few minutes until the next Yellow Line Southbound Service arrives

This is an attempt to Recreate the Tyne and Wear Metro using the new Scenery Update tools, currently, this route goes from Airport and St James to Pelaw and South Hylton, trains operate every 10-12 Minutes each way, like the real timetable

Things i plan to add in the future
-Way more Scenery
-Stations more detailed
– (Possibly) Gosforth Depot complete + ECS Moves